Industry solutions

Configuration by Working Condition

Choose your sector to see the typical dust, gas, energy and conveying problems, and the equipment combination we design for them.

How a project runs

From condition survey to commissioning

The same six steps apply whether you buy one conveyor or a complete flue gas treatment train.

  1. 01Condition surveyDust source, gas data, space and standard are collected.
  2. 02Scheme designEquipment sizing, layout drawing and pressure balance calculation.
  3. 03ManufacturingPlate rolling, welding, assembly and pre-shipment test run.
  4. 04Export shipmentExport packing, container plan and shipping documents.
  5. 05Installation guidanceDrawings, sequence and remote or on-site supervision.
  6. 06Commissioning & serviceStart-up tuning, operator training and spare parts supply.

Not in the list?

Describe your process and we will map the equipment

Mixed plants, retrofits inside existing structures and unusual material properties are handled case by case.

  • Dust source list, gas volume and temperature at each capture point
  • Pollutant composition, concentration and the emission standard you must meet
  • Available plot size, height limit and existing structures
  • Power supply, compressed air, water and maintenance access
See delivered projects

Ask for a configuration proposal

Engineering team replies within 1 working day.

Prefer a direct channel? Email szamtx@163.com or scan the WhatsApp QR code in the floating button.

We use only essential cookies to keep this site working and to remember your language and consent choice. No advertising or cross-site tracking cookies are set. Read our Privacy Policy.